3 3 answers from mybuilder damp proofing specialists.
Laying dpc floor.
The new stud wall was placed back in original arch from where it would have been built in brick in 1950.
Ensure the external edge of the dpc is visible and not bridged by mortar when completing pointing of the mortar joint.
If your damp proofing needs are minimal then cavity drainage may be the solution for you.
Guidelines for dpc laying.
Do i need a damp proofing course on my solid concrete floors before i have laminate laid.
Dpc material for floors roofs etc.
My solid floor is two bricks higher than ground level outside.
I had a company out and they said my walls are pretty much damp free and said it was more likely to be a breach in the floor dpc.
Before you lay the dpc you need to ensure that the surface of the stone masonry and brick are in level and also check the edges of the dpc which need to be straight vertical and even.
It is a membrane layer which sits between the concrete and the underlayment but it is not a liquid.
For greater wall thickness or where dpc is to be laid over large areas such as floors roofs etc the choice is limited to flexible materials that provide a lesser number of joints like mastic asphalt bitumen felts plastic sheets etc.
This damp proofing option is a specially designed plastic that you lay on the concrete and trim as needed to cover the entire floor.
Lay the dpc on a full even bed of fresh mortar in one continuous length for the full width of the leaf.
Provide at least a 100mm overlap at any joint or corners.
Besides the side shuttering of the structure must comprise of steel form while ensuring.
The dpc must not obstruct the cavity.
Set n stone construction.
There are few guidelines which you need to follow in order to lay the dpc for your building.
Or will getting an underlay with a damp proof membrane be sufficient.
First we set up shuttering making absolute sure there was no way it could move even with a.
Damp proofing concrete floors before laying laminate.